Resources

i

Final Development Plan

i

MIT Volpe Redevelopment Plan

02/03/2021

Development Proposal

Part I & Part II

Addendum #1 & Addendum #2

Visualizations by: Interface Multimedia & Design Distill

CDD PUD-KS Draft Framework

11/09/2015

In 2015 the Cambridge CDD released its draft PUD-KS Draft Urban Design Framework based on the K2 study.

Eastern Cambridge/Kendall Square Open Space Study

07/17/2015

The study and Connect Kendall competition culminated in the final Connect Kendall Square Framework Plan, the result of an innovative process that generated creative ideas and strategies. More information about that process is available  here.

Kendall Square Central Square Planning Study (K2C2)

2013 

In 2011-2012 the City of Cambridge conducted a comprehensive planning study and public process. The K2 committee recommendations  were incorporated into the 2013 Kendall Square Design Guidelines and Kendall Square Final Report.

Skip to content